no-img
PMBOOKS

دانلود کتاب Project Management with Dynamic Scheduling


PMBOOKS
بسته های تخصصی
تازه ها

adsads
گزارش خرابی لینک
اطلاعات را وارد کنید .

ادامه مطلب

دانلود کتاب Project Management with Dynamic Scheduling
zip
آذر ۳, ۱۳۹۴
0 تومان
رایگان – خرید

دانلود کتاب Project Management with Dynamic Scheduling


Project Management with Dynamic Scheduling

مدیریت پروژه با زمان بندی پویا

زبان: انگلیسی

نویسنده: Mario Vanhoucke

ناشر:SPRINGER

سال انتشار: ۲۰۱۳

ویرایش: دوم

تعداد صفحات: ۳۲۱  صفحه

حجم دانلود: ۵٫۹ مگابایت

لینک معرفی سایت Amazon

 Project Management with Dynamic Scheduling

0396


The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.

In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on “Dynamic Scheduling with ProTrack” has been completely rewritten and extended with a section on “ProTrack as a research tool”.


به اشتراک بگذارید:  [apss-share]



برچسب‌ها :
ads

دیدگاه ها


دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد. بخش‌های موردنیاز علامت‌گذاری شده‌اند *