no-img
PMBOOKS

Earned Value Management: The Most Important Methods and Tools for an Effective Project Control


PMBOOKS
بسته های تخصصی
تازه ها

adsads
گزارش خرابی لینک
اطلاعات را وارد کنید .

ادامه مطلب

PDF
Earned Value Management: The Most Important Methods and Tools for an Effective Project Control
pdf
آبان ۱, ۱۳۹۷
5.3 مگابایت
15000 تومان
15000 تومان – خرید

Earned Value Management: The Most Important Methods and Tools for an Effective Project Control


Earned Value Management: The Most Important Methods and Tools for an Effective Project Control

راهنمای عملی مدیریت ارزش کسب شده

زبان: انگلیسی

نویسنده: Roland Wanner

ناشر:-

سال انتشار: ۲۰۱۴

ویرایش: اول

تعداد صفحات: ۱۵۸ صفحه

حجم دانلود: ۵٫۳ مگابایت


This book covers the basic concepts of EARNED VALUE MANAGEMENT in an easy understandable way, supported by many graphical illustrations.

Controlling and reporting of project costs, schedules, technical progress and risks receives an ever-increasing importance in project management. With Earned Value Management you receive a very effective tool, which brings
the necessary transparency and security in your projects.

Find out the answers to this difficult questions:

    • My projects actual costs are lower than the planned costs. Does this
      mean that the project is working well or that it is behind schedule?
    • My projects actual costs are higher than the planned cost and the
      project is half completed. How much does the project cost at project closure?
    • Can we catch up with the current cost overrun or how much will these
      be at projects closure?
  • When will we have completed the project?

With the answers to these questions, you quickly find out the health of your
project. Over-optimistic estimates regarding the actual project progress are
quickly exposed by EVM performance figures. This way you obtain early warning
signs in order to manage your project successfully.




ads

دیدگاه ها


دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد. بخش‌های موردنیاز علامت‌گذاری شده‌اند *